| RCD Office Furniture, Reading
At RCD Office Furniture the existing uneven concrete floor of a disused pig farm was causing a problem for them to use the building for furniture storage and offices.
We installed a water-based cementations pumpable screed at a nominal 7mm thickness to provide a smooth and level new sub floor. A further two coats of coloured water-based epoxy |