| |
Raymarine, Portsmouth
Raymarine had specific needs for a fully anti-static floor. Owing to the condition of their existing floor surface and after suitable preparation and installation of copper earth grounding wires, an attractive, self-levelling conductive screed was laid. This covered 600m2 and was completed in two days. Not only did this provide them with an extremely durable and smooth floor but also a highly effective anti-static environment for their works. |
 |